{"id":64605,"date":"2023-10-12T06:00:07","date_gmt":"2023-10-12T04:00:07","guid":{"rendered":"https:\/\/staging.i4ce.org\/publication\/budgetisation-verte-retours-dexperience-des-collectivites\/"},"modified":"2025-01-06T14:52:42","modified_gmt":"2025-01-06T13:52:42","slug":"green-budgeting-feedback-local-authorities-climate","status":"publish","type":"publication","link":"https:\/\/staging.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/","title":{"rendered":"Green Budgeting: feedback from local authorities"},"content":{"rendered":"<h3>Time to take stock, 4 years after the first experiments<\/h3>\n<p>&nbsp;<\/p>\n<h3><em>Report only available in French<\/em><\/h3>\n<p>&nbsp;<\/p>\n<p><b><span data-contrast=\"none\">A momentum for green budgeting is gaining ground within local authorities:<\/span><\/b><span data-contrast=\"none\"> In the space of four years, around a hundred of them have embarked on the green budgeting process or have plans to do so. This includes nearly all the Regional Councils in metropolitan France and a third of municipalities or intermunicipal entities with over 100,000 inhabitants. While the primary goal of green budgeting is to enhance the budgetary process so that decisions can be made in favour of reallocating local authority expenditures towards environmentally friendly initiatives, how does it play out in practice? This study assesses the usefulness of green budgeting based on feedback from local authorities, particularly those that have undergone the process in the last 4 years.\u00a0\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span data-contrast=\"none\">Based on the input received by local authorities through questionnaires or semi-structured interviews, <\/span><b><span data-contrast=\"none\">the<\/span><\/b> <b><span data-contrast=\"none\">main contribution of green budgeting is to institutionalize and systematize opportunities for discussions on environmental issues during budget deliberations. <\/span><\/b><span data-contrast=\"none\">As a result, a green budgeting exercise should be seen more as an internal strategic management tool or a managerial approach with the aim of ensuring that environmental issues are taken on board by all departments, at the departmental level and by elected representatives, rather than as a strict budgeting or a reporting<\/span> <span data-contrast=\"none\">tool. Green budgeting also brings other benefits, such as enhancing transparency regarding the local authority&#8217;s financial and environmental efforts.\u00a0\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span class=\"TextRun SCXW111703409 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW111703409 BCX8\">Today<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">, the <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">integration<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> of<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> green budgeting <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">outcomes into budget planning and decision-making<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">,<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> which involves<\/span> <span class=\"NormalTextRun SCXW111703409 BCX8\">reallocating<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> expenditure<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">s<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> that can be redirected, <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">remains<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> limited.<\/span> <\/span><span class=\"TextRun SCXW111703409 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW111703409 BCX8\">Interviews with local authorities revealed<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> only<\/span> <span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW111703409 BCX8\">few<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> cases where <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">&#8220;<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW111703409 BCX8\">unfavourable<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">&#8221; <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW111703409 BCX8\">expenditure<\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW111703409 BCX8\">s<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> had been questioned because of this criterion.<\/span> <span class=\"NormalTextRun SCXW111703409 BCX8\">Conversely, the same holds true <\/span><\/span><span class=\"TextRun SCXW111703409 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW111703409 BCX8\">for <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">&#8220;<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW111703409 BCX8\">favourable<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">&#8221; expenditures that had been prioritized <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">because of<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> the process. <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW111703409 BCX8\">The still<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> recent and imperfect implementation of th<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">is <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">tool in <\/span><span class=\"NormalTextRun AdvancedProofingIssueV2Themed SCXW111703409 BCX8\">the majority<\/span><span class=\"NormalTextRun AdvancedProofingIssueV2Themed SCXW111703409 BCX8\"> of<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> local authorities interviewed <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">probably explains<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> its under-use as a decision-making <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">instrument thus<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> far.<\/span> <\/span><span class=\"TextRun SCXW111703409 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW111703409 BCX8\">However<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">, <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">those<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> interviewed consider that the green <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">budget<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">ing<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> tool could help in such <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">decision-making<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">, <\/span><span class=\"NormalTextRun AdvancedProofingIssueV2Themed SCXW111703409 BCX8\">provided that<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> there is <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW111703409 BCX8\">a political<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> will and that the results are available early <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">enough <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">in the budgetary process. <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">The use <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">of these results should<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> be <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">monitored<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> in the coming years, particularly when the new mandate projects are being drawn up, which is a key time for defining local authority&#8217;s projects, particularly <\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">concerning<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\"> investment<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">s<\/span><span class=\"NormalTextRun SCXW111703409 BCX8\">.\u00a0\u00a0<\/span><\/span><span class=\"EOP SCXW111703409 BCX8\" data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b><span data-contrast=\"none\">According to the local authorities interviewed in this study, ten key success factors can help establish green budgeting results as a decision-making criterion:\u00a0<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#1<\/strong> Having high-level political and administrative support (executive and general management);\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#2<\/strong> Allocating sufficient human resources and planning to allocate staff time to the process;\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#3<\/strong> Clearly explaining the objectives and limitations of the green budgeting tool to elected officials and departmental units;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#4<\/strong> Involving all departments and elected representatives from the very beginning of the process;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">#5<\/span><\/b><span data-contrast=\"none\">\u202fEstablishing a collaborative partnership between the ecological transition and finance departments, ideally with the support of the respective elected representatives;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#6<\/strong> Conducting green budgeting prior to making trade-offs to deliberate over green budgeting results when making decisions, and integrating green budgeting throughout all stages of the budget&#8217;s lifecycle, from forecasting to execution and evaluation;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#7<\/strong> Implementing green budgeting when drawing up future mandate projects;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>#8<\/strong> Ensuring the use of the tool over several years;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">#9 <\/span><\/b><span data-contrast=\"none\">Maintaining<\/span> <span data-contrast=\"none\">transparency about the methodology used, which must be robust and objective;\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">#10 <\/span><\/b><span data-contrast=\"none\">Maximizing the involvement of external partners and combining green budgeting with other existing tools to facilitate the collection of necessary information for its implementation.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:0,&quot;335559740&quot;:408}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span data-contrast=\"none\">\u202f<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Time to take stock, 4 years after the first experiments &nbsp; Report only available in French &nbsp; A momentum for green budgeting is gaining ground within local authorities: In the space of four years, around a hundred of them have embarked on the green budgeting process or have plans to do so. This includes nearly [&hellip;]<\/p>\n","protected":false},"featured_media":64307,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"type_publication":[49],"class_list":["post-64605","publication","type-publication","status-publish","has-post-thumbnail","hentry","type_publication-climate-report"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Green Budgeting: feedback from local authorities - I4CE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Green Budgeting: feedback from local authorities - I4CE\" \/>\n<meta property=\"og:description\" content=\"Time to take stock, 4 years after the first experiments &nbsp; Report only available in French &nbsp; A momentum for green budgeting is gaining ground within local authorities: In the space of four years, around a hundred of them have embarked on the green budgeting process or have plans to do so. This includes nearly [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/\" \/>\n<meta property=\"og:site_name\" content=\"I4CE\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-06T13:52:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"628\" \/>\n\t<meta property=\"og:image:height\" content=\"888\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@I4CE_\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/\",\"url\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/\",\"name\":\"Green Budgeting: feedback from local authorities - I4CE\",\"isPartOf\":{\"@id\":\"https:\/\/www.i4ce.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg\",\"datePublished\":\"2023-10-12T04:00:07+00:00\",\"dateModified\":\"2025-01-06T13:52:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage\",\"url\":\"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg\",\"contentUrl\":\"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg\",\"width\":628,\"height\":888},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.i4ce.org\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Green Budgeting: feedback from local authorities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.i4ce.org\/#website\",\"url\":\"https:\/\/www.i4ce.org\/\",\"name\":\"I4CE\",\"description\":\"Institute for Climat Economics\",\"publisher\":{\"@id\":\"https:\/\/www.i4ce.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.i4ce.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.i4ce.org\/#organization\",\"name\":\"I4CE\",\"url\":\"https:\/\/www.i4ce.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.i4ce.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2022\/07\/logo_I4CE-HD-qdr.jpg\",\"contentUrl\":\"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2022\/07\/logo_I4CE-HD-qdr.jpg\",\"width\":213,\"height\":247,\"caption\":\"I4CE\"},\"image\":{\"@id\":\"https:\/\/www.i4ce.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/I4CE_\",\"https:\/\/www.linkedin.com\/company\/i4ce\/\",\"https:\/\/www.youtube.com\/channel\/UCLZEgZVIiYP6TSDrid7A3mQ\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Green Budgeting: feedback from local authorities - I4CE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/","og_locale":"en_US","og_type":"article","og_title":"Green Budgeting: feedback from local authorities - I4CE","og_description":"Time to take stock, 4 years after the first experiments &nbsp; Report only available in French &nbsp; A momentum for green budgeting is gaining ground within local authorities: In the space of four years, around a hundred of them have embarked on the green budgeting process or have plans to do so. This includes nearly [&hellip;]","og_url":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/","og_site_name":"I4CE","article_modified_time":"2025-01-06T13:52:42+00:00","og_image":[{"width":628,"height":888,"url":"https:\/\/www.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@I4CE_","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/","url":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/","name":"Green Budgeting: feedback from local authorities - I4CE","isPartOf":{"@id":"https:\/\/www.i4ce.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage"},"image":{"@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg","datePublished":"2023-10-12T04:00:07+00:00","dateModified":"2025-01-06T13:52:42+00:00","breadcrumb":{"@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#primaryimage","url":"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg","contentUrl":"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2023\/10\/couv-rex-budget-vert-collterr.jpg","width":628,"height":888},{"@type":"BreadcrumbList","@id":"https:\/\/www.i4ce.org\/en\/publication\/green-budgeting-feedback-local-authorities-climate\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.i4ce.org\/en\/"},{"@type":"ListItem","position":2,"name":"Green Budgeting: feedback from local authorities"}]},{"@type":"WebSite","@id":"https:\/\/www.i4ce.org\/#website","url":"https:\/\/www.i4ce.org\/","name":"I4CE","description":"Institute for Climat Economics","publisher":{"@id":"https:\/\/www.i4ce.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.i4ce.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.i4ce.org\/#organization","name":"I4CE","url":"https:\/\/www.i4ce.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.i4ce.org\/#\/schema\/logo\/image\/","url":"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2022\/07\/logo_I4CE-HD-qdr.jpg","contentUrl":"https:\/\/staging.i4ce.org\/wp-content\/uploads\/2022\/07\/logo_I4CE-HD-qdr.jpg","width":213,"height":247,"caption":"I4CE"},"image":{"@id":"https:\/\/www.i4ce.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/I4CE_","https:\/\/www.linkedin.com\/company\/i4ce\/","https:\/\/www.youtube.com\/channel\/UCLZEgZVIiYP6TSDrid7A3mQ"]}]}},"_links":{"self":[{"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/publication\/64605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/publication"}],"about":[{"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/types\/publication"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/media\/64307"}],"wp:attachment":[{"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/media?parent=64605"}],"wp:term":[{"taxonomy":"type_publication","embeddable":true,"href":"https:\/\/staging.i4ce.org\/en\/wp-json\/wp\/v2\/type_publication?post=64605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}